Cost
Cost
Buildings are deprecated
Default extraction rate: 120m³ water per minute. Head Lift: 10 meters. (Allows fluids to be transported 10 meters upwards.) Extracts water from the body of water it is built on. Note that the water needs to be deep enough and that rivers do not commonly suffice.
20 MW